Plans for the near future.

I wanted to inform everybody of our current plans for the near future. We have spent this past week discussing, brainstorming, and planning for our future and using what we've learned since we started to help guide us to where we want, and where we feel we should be. To make a long story short, while we are currently operating at what we consider ... Повеќе »

29th Oct 2011
Hardware Firewall Installed

After much research, testing, and configuring, we are happy to say that our hardware firewall is now online and working properly in terms of network routing. We have run many tests and confirmed that all of our IP blocks are accessible at this time and all VPSs should be accessible at this time also (our IPv6 block is not currently configured ... Повеќе »

26th Oct 2011
Network Security Update

Wednesday (10/26/2011) morning we will make another attempt at adding the hardware firewall to our network. As before there will be a brief network disruption and hopefully this time everything will go as planned. We do not have a set time for this due to the fact that we will be working with the data center staff prior to the actual maintenance ... Повеќе »

25th Oct 2011
Hardware Firewall Removed

Unfortunately the hardware firewall did not go as planned and was removed shortly after being added. We will rescheduled the firewall addition for another time. Sorry for the downtime this has caused our clients.

-The Secure Dragon Staff

18th Oct 2011