ICE0001 is back online at this time and is working normally.
-The Secure Dragon Staff
We are rescheduling our ICE0001 upgrade to begin on Friday (3/2) at 10PM (EST) with the window continuing into Saturday (3/3) at 1AM. This window is bigger than the original because we will be performing other maintenance and testing at this time so we may not be able to start the migration at exactly 10PM. Downtime should be no longer than 1 ... weiterlesen »
Due to the new hardware not being racked in time for us to run at least a 24 hour test on it, we have postponed the upgrade. We do not have a set date yet due to other scheduled maintenance but we hope to have this done by Saturday morning. We will review our schedule and work out a plan of action to fit it. Thank you.
-The Secure Dragon Staff
We're undergoing a small, yet annoying DOS attack against SSH (dozens of bruteforce attempts per second) which was causing some slowness when connecting remotely. We have blocked the IP so it should return to normal in a few minutes while the current connections timeout.
-The Secure Dragon Staff