We will be monitoring our equipment closely for any issues before, during, and after the schedule maintenance. Thank you.Maintenance Date: October 3, 2015 9:00AM EST (No end ETA)
Details
An emergency repair to the UPS system will be performed Saturday morning, 10/3/15. The UPS manufacturer, APC will be replacing the static switch module on the UPS system supporting the Data Center in Suite 820, also known as the 8th Floor Data Center.
While not guaranteed, the manufacturer (APC) has stated that UPS operation should be normal during the repair effort, and they do not expect any service interruptions during this replacement.
-The Secure Dragon Staff
Mercoledì, Settembre 30, 2015